ioNova AI is an enterprise platform that converts unstructured payment address data into ISO 20022-compliant structured formats using AI-native address resolution. It serves banks, payment processors, and financial institutions preparing for the November 2026 SWIFT CBPR+ and SEPA structured address mandate, achieving 98% straight-through processing rates across 246 countries. The platform deploys in 2–4 weeks via sidecar architecture with no legacy system replacement required.

Achieve ISO 20022compliance withStructured Addresses

Hybrid addresses pass minimum compliance. Structured addresses pass every test. ioNova delivers AI-native structured and hybrid address resolution for SWIFT CBPR+ and SEPA

AI-native coverage / rules-engine determinism / 30+ years of payments compliance experience.

ARS ENGINE · RESOLVE & FIXrepaired
Free-text in
No. 33 Haitian 2nd Road NanshanLevel 15 near Shenzhen BayShenzhen 518054
Validated ISO 20022 out
<PstlAdr><Flr>Level 15</Flr><BldgNm>near Shenzhen Bay</BldgNm><BldgNb>No. 33</BldgNb><StrtNm>Haitian 2nd Road</StrtNm><DstrctNm>Nanshan</DstrctNm><TwnNm>Shenzhen</TwnNm><PstCd>518054</PstCd><Ctry>CN</Ctry></PstlAdr>
REPAIREDrule_source GB/T 7408 · PMPG v1.1144 ms

Our team has eliminated Payment Failures for leading global Banks

Partner logo 1
Partner logo 2
Partner logo 3
Partner logo 4
Partner logo 5
Partner logo 6
Partner logo 7
Partner logo 8
Partner logo 9
Partner logo 10
Partner logo 11
Partner logo 12

The Clock is Ticking: You Are Entering the 2-Month Window

0
0
4
4
6
6
Days

Nov '25

MT Format refused for payment messages.

Sep '26WE ARE HERE

Nov '26

DEADLINE. Unstructured addresses refused by SEPA and SWIFT.

Nov '27

E&I Mandate.

6 Signature Capabilities that Drive 98% Straight-Through Processing

ioNova is differentiated by deep banking logic

Financial ID Preservation

Validates 50+ identifiers (LEI, IBAN, BIC) before parsing begins.

Ensures entity integrity before splitting data.

Geographic Disambiguation

Resolves 28 Paris locations using postal formats and street patterns.

Distinguishes between Paris, TX and Paris, France with context.

Historical Name Resolution

Automates bidirectional mapping for cities like Bombay to Mumbai.

Handles legacy city names and street changes automatically.

Data De-Duplication

Intelligently removes redundant elements.

Cleanses repetitive information to ensure clean structured output.

Full Explainability

Provides field-by-field audit trails with specific rule citations.

Every decision is cited with a specific rule for compliance audit.

Confidence Scoring

Threshold-based routing (0.95+ auto-process) to minimize manual review.

Minimizes manual review by auto-processing high confidence data.

Master the Mandate: The 4 Pillars of Structured Data

Deep dive into the requirements, the ROI, and the technology behind ioNova.

ISO 20022 Structured Address Requirements

ISO 20022 Requirements

Understand what regulators actually require from EPC, SWIFT, and CPMI for structured address data.

View More

Business Value Beyond Compliance

Business Value

Turn compliance cost into operational advantage with 98% straight-through processing rates.

View More

Implementing Structured Address Resolution

Implementation

Achieve full compliance in 2-4 weeks with zero legacy system overhaul required.

View More

Why Payment Addresses Require Purpose-Built Intelligence

Purpose-Built AI

Discover why postal validation tools and generic LLMs fail at cross-border payment addresses.

View More

Why Postal Validation Tools, LLMs and generic vendors Fail for Payment Compliance

CapabilityGeneric Postal APIsLLMsIn-House BuildioNova
Output formatPostal standardUnstructured textCustom XMLNative ISO 20022 XML
CoverageMajor marketsTraining-dependentWhat you build246 countries, 50+ scripts
Financial ID handlingStripped / corruptedNot understoodManual50+ IDs preserved
Sanctions screening impactNoneUnreliableManual tuning~30% false positive reduction
ExplainabilityMinimalNone (black box)What you buildField-level rule citations
STP improvementMarginalN/AVariable40% → 98%
Implementation6–18 monthsWeeks (unreliable)18–36 months2–4 weeks
DeterminismDeterministicNon-deterministicDeterministicDeterministic with audit
ARS · Implementation Plan

From kickoff to go-live in 2–4 weeks.

Get started in 2 days. Two tracks run in parallel — your integrations and channels, and ioNova’s engine tuning — converging on a validated production go-live.

ioNova ARS implementation timeline: kickoff to validated production go-live in 2–4 weeks. Your team integrates and rolls out across four weeks — onboard and get credentials, set up integrations and channels, sandbox testing, and production validation — while ioNova tunes the engine on 10,000 representative addresses in parallel. Milestones: sandbox live on day 2, go-live in weeks 2–4. Outcomes: 2 days to get started, 10,000 representative addresses tuned, 2–4 weeks to validated production.
ioNova ARS · Address Resolution Service for ISO 20022 payments · one engine, two API groups (Party Address · Message Address)

What Financial Institutions Ask About ISO 20022 and Address Intelligence

Address intelligence parses, validates, enriches, and structures postal address data to meet ISO 20022 compliance. Unlike postal validation — which confirms a physical location exists — address intelligence resolves against regulatory standards, sanctions screening precision, and payment routing across 246 countries simultaneously.

Structured addresses populate dedicated XML elements (StrtNm, BldgNb, TwnNm, PstCd, Ctry) with validated components. Hybrid combines some structured with free-text. Regulators mandate structured as the target — hybrid is the minimum fallback. Delivering structured automatically satisfies hybrid with identical effort.

Postal APIs lack ISO 20022 XML output, can't handle financial identifiers, and cover primarily Latin-script markets. LLMs fail due to non-deterministic output, hallucination risk, latency exceeding sub-50ms P95 requirements, and no regulatory audit trail.

Address intelligence deploys in 2–4 weeks via sidecar architecture alongside existing infrastructure. No core banking system replacement required. Pre-built connectors for MuleSoft, Volante, and Finastra.

Institutions processing 500,000+ cross-border payments annually typically achieve 30–50x ROI within 12 months. The Entity Intelligence Platform delivers 366%+ three-year ROI.

Enforcement begins November 2026. MT was refused for new messages in November 2025. February 2026 marks the start of the 9-month critical implementation window. The E&I Mandate in November 2027 tightens further.

The November 2026 ISO 20022 Deadline Won't Wait
Your Address Data Shouldn't Either

Purpose-built address intelligence. 246 countries. 98% STP. 2–4 weeks to production.

46DAYS LEFT